The firefighting system should consist of two subsystems to cover the complete center.
The first subsystem (A) should be located at the prefab sides close to the staff entrance where a 10 thousand liters water tank is already available for the system. The second subsystem (B) should be located at the big waiting area close to the generators; 8 thousands liters water to be distributed on the top of the prefabs at the waiting area, four water tanks of 2 thousands liters to be installed and connected together to the sub pump at the subsystem (B).
The system requires the following features:
- Two 316 stainless steel made in Italy 15 Horsepower vertical fire pumps (one pump for each subsystem.
- One control panel for each subsystem. Location to be confirmed by the engineers.
- Four 2,000 liters 3 layers Accessories in & out for the subsystem (B)
- Four Landing Valves 2.5 inch.
- Six rolls fire Hose, 1.75-inch X 25 meters with BS aluminum coupling
- Four water branch pipes BS Standard.
Bids must be submitted as follows: by e-mail in PDF format to elahmady@unhcr.org
Please indicate in the e-mail subject field:
- RFQ/2020/075
- Name of your firm
All bids must be received latest by 24th of December 2020, 10:00am (LOCAL TIME) or earlier.