Rehabilitation of Solar Water Pumping Plants Components in South Lebanon
Oxfam Lebanon Programme
Background
Oxfam is a global movement of people, working together to end the injustice of poverty. Oxfam has been working in Lebanon since 1993. We provide humanitarian assistance to vulnerable people affected by conflict, and we promote economic justice and good governance, and women’s rights. Oxfam also works with local partners to contribute to the protection and empowerment of marginalized women and men.
Project Objective
Oxfam is supporting the South Lebanon Water Establishment in the rehabilitation of their solar PV water pumping stations. Therefore, Oxfam is seeking a supplier/contractor to replace damaged components of the PV plants used for water pumping in South Lebanon (batteries of lead acid type, PV panels, contactors, electric relays, sinewave filter, reactors, padlocks, valves, etc.)
General Requirements
- The contractor should demonstrate his proposal with a sample or detailed specifications with pictures.
- The quantities of the items described in the above may be increased or reduced according to the site conditions, based on the same pricing presented in the bill of quantities.
- The contractor is responsible for the material supply, power supply and all means of works on site.
- Oxfam has the right to reject any items/works not approved by the delegated engineer.
- The period of execution of works should not exceed 15 calendar day.
- The contractor should prepare and submit technical and financial offer for the works with detailed Work plan, detailed Bills of Quantities, and execution schedule.
- The contractor will be responsible to provide transportation for his worker to the site.
- The tender items are not dividable.
- The Site Engineer may amend what he deems "technically" suitable for the project and after taking the approval of Oxfam, and the Contractor must abide completely with what was required by the supervising committee.
- The Contractor’s relationship will directly be with OXFAM staff.
- OXFAM staff or his/her representative will be present onsite during the installation.
- The contractor shall execute all work required in the presence of the site Engineer or his/her representative considering that the supervision committee has the right to require re-implementation in case of violation of specifications agreed in the technical Book of Conditions or the instructions of the supervising committee or which have been executed in the absence of Oxfam supervisors without informing the supervisor of the time of executing the works.
- Oxfam Team or his/her representative is responsible to monitor and confirm the work.
- Oxfam has the right to increase or decrease quantities at the same unit cost.
- The contractor should assign a site engineer/technician to follow the execution work and be the focal point from the contractor field side.
- The contractor should ensure safety and security/prevention to avoid any accident while implementing the activity.
The Contractor must:
- Ensure that the supplied items are brand new not renewed, and that applies to all the supplied items. Preference is given to the items that have proven technical quality and efficiency during the operation.
- Bill of Quantities
Description
Quantity
Unit
Unit cost
Total cost
Ankoun
Action
1.1
Supply and install of 5 PV panels to replace damaged 5 PV panels of 470 Wp (550 Wp Tier 1 panels are preferred)
5
item
1.2
Supply and install a sine wave filter of nominal power higher than 145 kW with a ventilated box, to replace existing output reactor "OCL 2-055-4-5% 150 A " by, compatible with the existing inverter and pump
1
item
1.3
Supply and install 2 electrical panel board cabinets (IP65) to protect change over switches, dimensions:
2
item
1.2m X 1.5m X 30cm
50cm X 50cm X 30cm
Harouf
Action
1.1
Supply and install of 5 PV panels of 550 Wp (Tier 1 panels are preferred)
5
item
1.2
Supply string trimmer for grass removal (Heavy duty, >50 cc quick start gasoline engine, >40 cm cutting width)
1
item
Marwanieh
Action
1.1
Supply and install of 3 PV panels of 550 Wp (Tier 1 panels are preferred)
3
item
1.2
Supply and install a sine wave filter of nominal power higher than 120 kW with a ventilated box, to replace existing output reactor"CKSG2-0900/63-4-90 KW 200 A, compatible with the existing inverter and pump
1
item
Nmayrieh
Action
1.1
Supply and install of 9 PV panels of 550 Wp (Tier 1 panels are preferred)
9
item
Al Nafakhieh
Action
1.1
Supply and install of 10 PV panels of 550 Wp (Tier 1 panels are preferred)
10
item
Kalawey
Action
1.1
Supply and install of 20 PV panels of 550 Wp (Tier 1 panels are preferred)
20
item
Borj Kalawey
Action
1.1
Supply and install of 8 PV panels of 550 Wp (Tier 1 panels are preferred)
8
item
Aytit
Action
1.1
Supply and install of 9 PV panels of 550 Wp (Tier 1 panels are preferred)
9
item
Tayrdibba
Action
1.1
Supply and install of 25 panels of 550 Wp:
Tayrdebba 3: 15 panels
25
item
Tayrdebba 2 :5 panels
Tayrdebba 1: 5 panels) PV panels
(Tier 1 panels are preferred)
1.2
Supply and install a sine wave filter of nominal power higher than 120 kW with a ventilated box, to replace existing output reactor, compatible with the existing inverter and pump
1
item
in Tayrdebba 1
1.3
Supply and install a sine wave filter of nominal power higher than 82 kW with a ventilated box, to replace existing output reactor, compatible with the existing inverter and pump
1
item
in Tayrdebba 2
Kssaybe
Action
1.1
Supply and install of 7 PV panels of 550 Wp (Tier 1 panels are preferred)
7
item
1.2
Supply and install a sine wave filter of nominal power higher than 100 kW with a ventilated box, to replace existing output reactor, compatible with the existing inverter and pump.
1
item
Siir al Gharbye
Action
1.1
Supply and install of 38 PV panels of 550 Wp (Tier 1 panels are preferred)
38
item
1.2
Supply and install a sine wave filter of nominal power higher than 82.5 kW with a ventilated box, to replace existing output reactor, compatible with the existing inverter and pump.
1
item
Kaakyet al Jesser
Action
1.1
Supply and install of 7 PV panels of 550 Wp (Tier 1 panels are preferred)
7
item
Zawtar al Gharbye
Action
1.1
Supply and install of 13 PV panels of 550 Wp (9 out of the 13 damaged PV panels were initially 340 Wp) (Tier 1 panels are preferred)
13
item
Baysarieh
Action
1.1
Supply and install LITHIUM BATTERY bank of 15 KWh (compatible with existing DEYE inverter) to replace existing damaged lead acid batteries
1
item
Srifa
Action
1.1
Supply and install of 1 PV panel of 550 Wp (Tier 1 panels are preferred)
1
item
Maarake
Action
1.1
Supply and install one battery of lead acid type (storage capacity 100 Ah, 12 V), and all needed accessories (35 mm2 DC cable, fixing connections)
1
item
1.2
Supply and install three 6 inches gate valve (brass or equivalent, EU Origin)
3
item
1.3
Supply and install six 4 inches gate valve (brass or equivalent, EU Origin)
6
item
1.4
Supply and install one 8 inches gate valve (brass or equivalent, EU Origin)
1
item
1.5
Supply and install one 3 inches gate valve (brass or equivalent, EU Origin)
1
item
1.6
Supply and install one 2 inches gate valve (brass or equivalent, EU Origin)
1
item
1.7
Supply and install one contactor for pump (100 hp) from solar to EDL (EU origin or equivalent)
1
item
1.8
Supply and install one flow meter, Water, 2'' (EU origin or equivalent)
1
item
1.9
Supply and install one pressure gauge, water supply, 0-20 bar, 1'' BSP thread adaptor (EU origin or equivalent)
1
item
Total
VAT (11%)
TOTAL (after VAT)
Tenders’ evaluation and other considerations
The contract will be awarded to the administratively and technically compliant tender that is the most economically advantageous, considering the quality of the services offered and the price of the tender, otherwise referred to as “best value for money”. Tenders will be evaluated on the criteria listed below:
CRITERIAS
Award criterias
Max. Score
% of overall
Capability / competence of tenderer to perform the service required
Experience in implementing of similar type of works, of similar scale
30
30%
Experience with Oxfam or other international NGOs of a similar Oxfam volume.
Experience working with the Bekaa Water Establishment
Qualifications, skills, languages, or experience of key personnel engaged in the project
Quality / Understanding of requirements
Meeting technical specifications (quality, methodology, etc.) OR Level of understanding of work/service required
30
30%
Ability to meet delivery dates OR Reliability of plan proposed
Prices for
Services
Price proposal of service in accordance with the request
40
40%
TOTAL MAXIMUM GENERAL SCORING
100
100%
Contract will be awarded to highest scored bid provided it passes all the following criteria:
- Bidder shall be fully compliant with the present TOR.
- List of customers (solar projects) in the past years (including power of the system, name of contracting party, contract value and date of completions).
- The bidder must have a minimum of 3 years’ experience in construction of solar photovoltaic solutions (bidders with less than 3 years of experience are not eligible)
- Bidder PV projects references including contact names and phone numbers.
- CVs of bidder’s key personnel to be mobilized for this project (project manager, electrical engineer, field supervisor, civil engineer).
- Bidder financial statements for the last three years.
- Bidder shall submit at tender stage the following documents:
- Datasheets, certificates and any other technical documents to show compliancy of all the specified components (Mandatory).
- Proposed methodology of work clearly developing the expected work phases.
- Bidder shall provide completed priced Bill of Quantities (BOQ)
- An organizational (human resources) chart
- Company Profile.
- Copies of Institution registration certificate and VAT registration certificate (if available) apply for companies only not individuals.
Coordination and Supervision
The activity will be supervised by Oxfam’s team.
The work is scheduled to commence one week after the contract is signed.
Please submit the full application documents (as mentioned above) to lebresponseprocurement@oxfam.org.uk by mentioning “Rehabilitation of Solar PV Plants Components in South Lebanon” in the Subject line, before 21 February 2025, midnight.
Questions / Request for clarification
Any requests for clarification may be submitted by email to lebresponseprocurement@oxfam.org.uk by mentioning “Rehabilitation of Solar PV Plants Components in South Lebanon” in the Subject line.
Timeframe and Payment
100% payment after completing the installation of the requested quantity and submitting the financial documents.
Coordination and Supervision
The activity will be supervised by Oxfam’s team.
The work is scheduled to commence one week after the contract is signed.
Please submit the full application documents (as mentioned above) to lebresponseprocurement@oxfam.org.uk by mentioning “Rehabilitation of Solar PV Plants Components in South Lebanon” in the Subject line, before 23 February 2025, midnight.
Questions / Request for clarification
Any requests for clarification may be submitted by email to lebresponseprocurement@oxfam.org.uk by mentioning “Rehabilitation of Solar PV Plants Components in South Lebanon” in the Subject line.