Skip to main content

Request for an Automatic Drip Irrigation System

The project aims to enhance environmental health in Lebanon by promoting sustainable agricultural practices and income generation through circular economy principles. It seeks to educate communities in North Lebanon on the ecological use of natural resources and build resilient livelihoods for vulnerable populations. Additionally, the project focuses on training teachers to raise awareness among children about climate change and sustainable agriculture. Through these efforts, the project supports long-term environmental well-being and economic stability in the region.

 

  1. Technical Specifications of the Automatic Drip Irrigation System

Controllers & Automation

  • 1 pc: ESP-SM3 3 Station Module (Rainbird)
  • 1 pc: IESP-4ME Modular Controller 4 Station Outdoor (Rainbird)
  • 1 pc: ESP-SM6 6 Station Module (Rainbird)

 

Valves & Accessories

  • 12 pcs: 1" HVF Valves with Flow Control
  • 12 pcs: 10" Valve Boxes
  • 168 pcs: 16x16 Plastic Valves (Blue)
  • 3 pcs: Plastic Valve 3/4"
  • 1 pc: Plastic Valve 1 1/4"

 

Pumping & Filtration

 

  • 1 pc: Disk Filter Mini T 1 1/2"-120 Mesh
  • 1 pc: 15 HP Pump (European made)

 

  • 1 pc: Strainer 1 1/2"
  • 1 pc: Pressure Control
  • 1 pc: Venturi Fertigation System with Accessories

 

Pipes

  • 200 m: 40mm Pipe – PN16
  • 15 m: 32mm Pipe – PN16
  • 75 m: 32mm Pipe – PN6
  • 75 m: 20mm Pipe – PN4
  • 5 m: 25mm Pipe – PN4

 

Drip Irrigation

  • 9 rolls: Q-Drip Pro 16-4-25-1.0mm – 400m each
  • 500 pcs: Ground Hooks 15 cm
  • 168 pcs: Barbed Male Adaptor 16 x 1/2"
  • 25 pcs: Barbed Connector 16 x 16

 

Fittings & Accessories

  • Terminal Adaptors, Saddles, Tees, Nipples, Elbows, and Adaptors in various sizes (full list above)
  • 12 rolls: Large Teflon
  • 20 rolls: Teflon Nelson 12mm – 10m

 

Cables

  • 300 m: Control Cable
  • 300 m: Electric Cable Cover

 

  1. Requirements & conditions

The service provider is required to deliver all items to the agricultural site in Chekka along with workers/helpers available to assist with loading and unloading products, as and whenever needed.

  1. Company qualification

The company must have the following valid legal documents:

  • Commercial Circular
  • Fiscal Certificate of Incorporation at the Ministry of Finance
  • VAT Certificate of Registration if applicable
  • ID of company’s authorized representative(s)

 

  1. Evaluation

 

  • The quotation’s evaluation process will consider following with assigned weights:
  • Financial ......................................... 50%
  • Technical ........................................ 40%
  • Reputation & Reference Check ...... 10%

 

 

  • Payment Terms:
  • Payments will be made through bank cheques
  • Payment will be made 20 business days after last delivery and submission of final invoice.

 

Call Type
Call for Tenders
Organisation
Intervention Sectors
Agriculture
Development
Training & Capacity Building
How to Apply

Only selected candidates will be contacted

Deadline
Countries
Lebanon