TERMS OF REFERENCE
Oxfam is a global movement of people who are fighting inequality to end poverty and injustice. Across regions, from the local to the global, we work with people to bring change that lasts.
OVERVIEW
Title and brief description of the requirement
Rehabilitation of four water points
Delivery location
Saaide, Talia and Houche Barada North Bekaa
How to apply
Interested candidates are invited to submit their offer by email to Lebanonprocurement@oxfam.org.uk
Deadline for submission of offers
Deadline to be on Thursday 25 September 2025.
Specific Considerations
Mandatory office visit for a presentation to be held by the program team and then to proceed with a visit to the site. Date : Tuesday 23 September 2025 at 10 AM (Oxfam Zahle office = https://goo.gl/maps/Z9LRCCUAWisESgd59) Interested suppliers should send email to Lebanonprocurement@oxfam.org.uk. With email subject strictly being “Rehabilitation of four water points”
- BACKGROUND AND CONTEXT
Oxfam is a global movement of people, working together to end the injustice of poverty. Oxfam has been working 2in Lebanon since 1993. We provide humanitarian assistance to vulnerable people affected by conflict, and we promote economic justice and good governance, and women’s rights. Oxfam also works with local partners to contribute to the protection and empowerment of marginalized women and men.
Oxfam is supporting the Syrian refugees in the rehabilitation and renovation of the water points available in the informal settlements. Therefore, Oxfam is seeking a supplier/contractor for the rehabilitation of four water points in Saaide, Talia and Houche Barada.
- SPECIFICATION OF GOODS AND SERVICES REQUIRED
ITEM
Description
Saaide 008 Water Point
Cleaning Tank
Clean and disinfect the existing plastic water tanks 6000L
Water Tank Installation and Fixation
Installation of the existing plastic water tank 6000 L on the nearby existing steel stand. Works include fixation with steel ropes of 5mm thickness
Plastic Water Tank Cover
Supply and install plastic cover for the plastic water tank 6000 L
Feed Pipe
Fix the available 4-inch feed pipe to the 6000L plastic water tank
The work includes excavation and backfilling where needed [EK1]
Steel Valve
Supply and install 1/2-inch steel ball valve (European brand or equivalent). The work includes installing a distributer HDPE line 1/2 inch with all its accessories on the four tanks and distributing these steel valves on them
Distributer HDPE Pipe
Supply and Install HDPE PIPE ½-inch with all its accessories and fittings, and connect the tents with the existing water tanks 6000L
Plastic Ball Valve
Supply and install 4-inch plastic ball valve
(European brand or equivalent)
Talia 027
Water Tap
Supply and install stainless steel water tap 1/2 inch
( European Brand or equivalent )
it should be for heavy duty applications
Tee HDPE
Supply and install Tee HDPE 1/2 inch
Elbow HDPE
Supply and install Elbow HDPE 1/2 inch
Saddle
Supply and install Saddle 1/2inch to 1/2inch
Talia 012
Water Tap
Supply and install stainless steel water tap 1/2 inch
( European Brand or equivalent )
it should be for heavy duty applications
Tee HDPE
Supply and install Tee HDPE 1/2 inch
Elbow HDPE
Supply and install Elbow HDPE 1/2 inch
Saddle
Supply and install Saddle 1/2inch to 1/2inch
Houche Barada 022
Water Tank Cleaning
Clean and disinfect the existing plastic water tanks 6000L
Water Tap
Supply and install stainless steel water tap 1/2 inch
( European Brand or equivalent)
it should be for heavy duty applications
Water Tank Cover
Water Tank cover (Global Plast)
Item quantities are subject to change, and some items may be removed
Mandatory Site Visit: Supplier who didn’t attend the site visit, they can’t submit their offers
All interest suppliers are invited to the mandatory site visit, and they need to send interested email
4.METHODOLOGY
The key steps to be followed though not explicit and the detailed modality and work plan will be agreed during consultation meeting include:
[Proposed methodology/ key steps to be followed]
[ Information on project organisation, roles and responsibilities etc.]
Planned timeline
Activity / Milestone
Outputs or Deliverables
Estimated days
Timeline
Saaide 008 Water Point Rehabilitation
As per Attached BOQ (will be sent later to the supplier who attends the site visit)
1 working day
Approx. date : 1st week of October.
Talia 027 Water Point Rehabilitation
As per Attached BOQ (will be sent later to the supplier who attends the site visit)
1 working day
Approx. date : 1st week of October.
Talia 012 Water Point Rehabilitation
As per Attached BOQ (will be sent later to the supplier who attends the site visit)
1 working day
Approx. date : 1st week of October.
Houche Barada 022 Water Point Rehabilitation
As per Attached BOQ (will be sent later to the supplier who attends the site visit)
1 working day
Approx. date : 1st week of October.
4.TIMEFRAME AND PAYMENT SCHEDULE (remove this section if not required)
Remuneration is based on submission of final deliverables according to the schedule below.
No.
Deliverables or Documents to be delivered
Estimated Dates
% Payment
1
Saaide 008 Water Point Rehabilitation
After 30 days of invoice submission
(After completion and handover of all the work)
0%
2
Talia 027 Water Point Rehabilitation
After 30 days of invoice submission
(After completion and handover of all the work
0%
3
Talia 012 Water Point Rehabilitation
After 30 days of invoice submission
(After completion and handover of all the work
0%
4
Houche Barada 022 Water Point Rehabilitation
After 30 days of invoice submission
(After completion and handover of all the work
0%
Handover all the work
After 30 days of invoice submission
100%
TOTAL
100%
5. EXPERIENCE OR PROFILE REQUIREMENTS
The company/ individual(s) should have the following competencies:
Essential
- I.D. card for the person signing on the bid empowered by the power of attorney.
- Academic / Professional qualification (CVs)
- Copies of original documents that demonstrate their legal establishment, registration, and status.
- Confirmation letter of delivery time 3 working days Please attach a pdf document.
- Data sheets for each item specified in the BoQ. Each data sheet must be saved as a separate file with the corresponding item name.
- Experience with Oxfam / NGOs / working in development/ humanitarian settings (Similar experience. Please attach a table including company name, work description.)
- Proficiency in the relevant market of this request (Reference of two or more clients within similar scope we need (Preferable with NGOs) (NGO Name or private client name, contact person and email, project description, locations, value of money).
- Detailed Work plan (not more than 3 working days)
- Financial Folder:
- Detailed financial offer for the Bill of Quantities
6. APPLICATION PROCESS
Submission instructions
Quotations and applications must reach Oxfam no later than
Responses must be submitted in English, electronically to: lebanonprocurement@oxfam.org.uk
The subject of the mail should be: “Rehabilitation Four Water Points”
Any questions, remarks or requests for clarification can be sent up to ‘before the submission deadline in writing. The (anonymised) questions will be answered to all applicants.
Administrative requirements
To be shortlisted for evaluation against award criteria, the following documents must be submitted with this application:
Documents to be submitted
Importance
1
Supplier Quotation/Proposal (description of the goods/services/works provided as per the specification, including any details of quality, brand and a clear indication of pricing
• All prices must appear in USD, with unit prices, total price and with a breakdown of applicable taxes (specify the VAT rate if applicable)
• For works, the total budget, which must include a detailed breakdown of costs by [deliverables / day / working hours].
• Date and validity of quote must be included
Mandatory
2
Proof of registration: The bidders also must include a copy of their registration at the relevant Chamber of Commerce and / or document showing self-employed tax registration.
Mandatory
3
Evidence of previous work / references List of similar publications or any other documents proving similar experience and technical and thematic knowledge.
Mandatory
Evaluation and award criteria
The quotations will be assessed according to the following criteria and distribution of points:
Award Criteria
Max. points
Technical criteria
Capability / competence of bidder to perform the work / service required
Demonstrated expertise and experience in rehabilitation work
20
Previous experience with the NGO sector
5
Positive references/reputation for minimum two clients
10
Quality of products/ services and ability to meet requirements
Meeting technical specifications OR Level of understanding of work/service required
10
Added value of items or services offered (ex. quality, warranty, after-sales support)
5
Ability to meet delivery dates OR Reliability of plan proposed
10
TOTAL:
60
Financial criteria
Financial offer
Total cost of the offer, all services included (without added tax)
40
TOTAL:
100
Oxfam withholds the right to conduct interviews with one or more potential suppliers before an award decision is made. The purpose of the interview is to seek further clarification on the submitted quotations and learn more about the background and previous experiences of the potential suppliers and their teams.
7. OTHER CONDITIONSConditions for participating in the procurement process are detailed in the Terms & Conditions of Bidding
8. CODE OF CONDUCTOxfam is committed to integrity in its operations and supply chains and ensuring high ethical standards. Complying with all laws and regulations and ensuring fair competition are fundamental to this commitment. We actively promote these principles and standards and expect all Oxfam suppliers to demonstrate commitment towards them.
All suppliers/applicant are required to agree and adhere to the Oxfam Supplier Code of Conduct, whereas individuals (including consultants) must sign the Oxfam Non Staff Code of Conduct[1]. These Codes of Conduct set out the specific standards and principles in the areas of human and labour rights, environmental impact and anti-corruption that suppliers must follow.
ANNEXES
[1] Non-Staff Code of Conduct applies for any self-employed individuals or contracted employees of suppliers who are working on Oxfam sites, or who have access to Oxfam materials, or who may represent Oxfam in any manner but are not part of Oxfam’s legal entity)
[EK1]Better to mention the diameter and type of the pipe
Quotations and applications must reach Oxfam no later than
Responses must be submitted in English, electronically to: lebanonprocurement@oxfam.org.uk
The subject of the mail should be: “Rehabilitation Four Water Points”
Any questions, remarks or requests for clarification can be sent up to ‘before the submission deadline in writing. The (anonymised) questions will be answered to all applicants.