Michel Daher Social Foundation (MDSF), established in 2014, is a Lebanese NGO dedicated to addressing the unique challenges faced by communities in Central Bekaa. Committed to creating an environment where individuals can achieve their highest potential, the foundation focuses on community health care, economic and human capacity building, sustainable community development, and livelihood. MDSF's mission is rooted in providing support to help people overcome life challenges and to make a positive impact on the Bekaa community.
Project Overview:
The project aims to increase access to safe and reliable water services among communities in Zahle Caza, Lebanon, with a focus on improving capacities of the Bekaa Water Establishment (BWE) and enhancing water services for upstream and downstream communities of Jdita. The project includes technical and material capacity strengthening, community engagement, facilitation of allocation agreements, and activation of the regional water network.
Scope of work
Chlorination
The chlorination system in the Jdita Water Station needs to be repaired and retrofitted. An overall treatment should be done for the system, including all the system’s components. The following is the main scope of work. The system should be handed over fully functional.
Chlorination system repairs:
· Treatment of leaking in the chlorination system: replacement of all needed valves, elbows and adaptors.
· Check and recalibrate chlorine dosing pumps periodically to ensure they are delivering the correct chlorine amounts.
· Cleaning of all existing equipment (flow meter, switchover, chlorine injector, etc.)
· Refilling of empty chlorine cylinders (x4 sets) for each chlorination station
· Train the existing staff about how to use the refills and the system’s components, as well as the safety procedures and measures that should be adopted when in contact with the chlorination system.
· Repairs and installation fees should be included
In addition, install split DX units for both rooms in order to keep its temperature under control and ease the process of chlorination, as well as raise its efficiency:
· 12,000 BTU/h (x2)
· Including 6 meters of copper (x2)
· Including installation (x2)
Expected deliverables
The Qualifications
The contractor is to fulfill all requirements of the scope of work, and in case of any discrepancies and/or unexpected circumstances to notify immediately. The contractor is to provide the following documents:
- Datasheet of the cylinders
- Datasheet or brand and country of origin of the components to be replaced
- Company profile or CV
- Financial Offer
To apply, please submit your proposal (technical and financial) along with your resume and work/ project portfolio by email to: procurement@daherfoundation.org before 26 June, 2025
SELECTION CRITERIA
The consultant will be selected based on:
- ID and Resume are a must
- Technical Competence: Material specifications must clearly define types, standards, and sizes to ensure quality and compliance. Technical competence—covering experience, expertise, project understanding, will account for 60% of the evaluation score.
- Value for Money: This criterion assesses the cost-effectiveness of the consultant's services compared to their competitors while ensuring quality and meeting project objectives. It accounts for 40% of the scoring.