SOS Children's Villages Lebanon aims in this tender file to execute the “PV solar system installation” at the “SOS Bhersaf village”.
1. Required documents:
The bidder shall provide the following documents (SOS might request additional documents):
- Registration Certificate of the company.
- Registration in the ministry of finance.
- VAT registration certificate.
- Company profile.
- All insurances must be provided by the general contractor (during the tendering phase, the contractor will have to submit a signed and stamped letter stating that the contractor will provide the required insurances if awarded).
- List of similar executed projects (a minimum of three projects).
- Organization Chart reflecting the structure of the team who will be assigned to implement and monitor the required works and services.
- Time schedule.
- Material data sheets and samples.
- Health and safety plan
Special Conditions:
- The bidder must conduct a site visit in order to verify the quantities and details (site visit is mandatory).
The proposal of a contractor who did not conduct a site visit will be rejected.
The site visit will be held on Friday 10-January-2025 @ 10:00 A.M.
Deadline Friday 17-January-2025.
- Hand written/filled offers will be rejected.
- Electricity and water during working hours are to be provided by the contractor including water for waterproofing testing.
- The contractor should perform two cleaning cycles for the PV panels. One cycle after 6 months from installation and one cycle after 12 months from installation.
- Material technical data sheets should be submitted.
- Concrete properties:
- Ready mixed concrete is to be used.
- Concrete compressive strength is to be a minimum of 30 MPA (at 28 days).
- Concrete cylinders are to be taken (by the general contractor) for compressive strength testing.
- No mixing is allowed onsite (except for grout to be used in repair).
- Material lifting and handling onsite are to be conducted by the general contractor.
- Rerouting of electro-mechanical connections, in order to conduct waterproofing works is to be conducted by the general contractor.
- All debris and resulting material are to be removed away from site by the general contractor.
Call Type
Call for Tenders
Organisation
Intervention Sectors
Children & Youth
How to Apply
All bids must be submitted in sealed envelope showing the project name, bidder’s name, phone number and email to the following address:
Beirut, Sin El Fil, Monseigneur Shebli street, SOS building, 3rd floor.
Note that all pages should be stamped and signed.
Deadline
Countries